You are · Architect
You design the project.
- Does the project fit within the client’s budget?
- How do I cost during design, not afterwards?
- Who prepares the tender documents and compares the tenders?
What we do for you
What we do for you.
- Cost alongside the project
Structured estimates by CFC during the design phase, project modelled and costed with our database (Attic+). - Options weighed
Analysis of options and their financial impact, before design choices are made. - Tender documents and tenders
Preparation of tender documents, comparison of tenders on the same basis, SIA standards checked.
You keep the design. We provide the figures, the checking and the economic management.
Your path, step by step
Your path, step by step.
- STAGE 1Feasibility
- STAGE 2Financial plan
- STAGE 3Design and permit
- STAGE 4Consultation
- STAGE 5Execution and handover
What you receive
- Economic feasibility, options
- Target cost tracked at every stage (Attic+)
- Design and permits, SIA standards checked
- Tender documents and tenders compared (Monday)
- Open-book execution, snagging items (Procore)
Further reading
To go further.
Material pricesConstruction prices 2026: what the indices sayConstruction prices are not rising uniformly. Depending on the trades and types of work, the differences are clear. A reliable budget relies on these indices, not on an average.CostingComparing contractors’ offers: the same basis, or nothingComparing two offers is not comparing two totals. It means checking that they describe the same thing, at the same level of detail.CostingThe CFC: the common language of construction costIn Switzerland, the costs of a construction project are described in a common language: the CFC (Swiss construction cost classification).
Present your project to us.
A first conversation, without obligation: the address or plot, your objective, an indicative budget.